Toronto's construction costs are lower than Vancouver’s, particularly in residential and commercial sectors.
In Toronto, the cost of concrete high-rise buildings is closer to $300 per sq. ft, lower than Vancouver.

Toronto’s Construction Costs Lag Behind Vancouver’s | MrHunter.ca
by
Tags:
Leave a Reply